Salt Lake County, Utah

Pool removal in Murray

Most pools we take out in Murray are 1970s-1980s vinyl & gunite builds. We remove them, backfill the hole to a structural standard, and leave ground you can build on.

  • Licensed & Insured
  • 8-Ton Midi Excavator
  • Engineered Compaction

Why Murray pools need more than a dump-and-fill

Pulling out a pool is the easy part. What matters is the ground left behind, because it has to carry a lawn, a patio, or a whole new building for decades. A pool that is crushed in place and covered with loose dirt can keep settling for years, leaving sinkholes, standing water, and cracked slabs.

The ground under most Murray yards is valley floor clay and silt. Clay holds water and drains slowly. If the pool floor isn't broken up for drainage and the fill isn't compacted in layers, water collects in the old basin and the ground above it goes soft.

Backfill and drainage in Murray

High groundwater requiring active pumping: that's the site condition we plan around first in Murray, because it shapes how we dig, drain, and fill the hole. For the backfill itself, we place fill in thin lifts and compact each one to 95% of its maximum dry density under the Modified Proctor test (ASTM D1557), the standard engineers use for ground that will carry structures.

Building where the pool was

In Murray, a big part of what's driving pool removals is central valley infill development. If an ADU, garage, or addition is going where the pool was, the ground under its footings has to be solid. A partial removal leaves broken concrete in the ground, which works under a lawn but is a poor base for a foundation. For any structure, we recommend full removal with compaction that can be tested and documented for your permit.

Engineers and building departments commonly call for fill under new footings to be compacted to at least 95% of the Modified Proctor maximum dry density (ASTM D1557), confirmed with field density tests as each lift goes in. That's already the spec we build to here, so the old pool site is ready for the testing your ADU permit may require.

Water, utilities, and selling your home

Before demolition, the pool has to be drained legally. The rule we follow in Murray: De-chlorinate below 0.1 ppm before storm drain discharge; max 30 GPM. Some cities send pool water to the sanitary sewer instead of the storm drain, so we confirm which applies before the pump goes in.

Most in-ground pools also have a gas heater and a dedicated electrical sub-panel.Utilities in Murray are Enbridge Gas Utah (formerly Dominion Energy) gas and Murray City Power electric. Licensed trades cap the gas line and lock out the pool circuits before the excavator arrives.

If you plan to sell, the paperwork matters too. The Utah Seller's Property Condition Disclosure asks sellers to disclose known buried debris, fill, and settling. A partial fill-in leaves broken concrete in the ground, and a buyer's inspector or lender may flag it. Full removal with a compaction report gives you documentation instead of a disclosure question.

Permits and disposal in Salt Lake County

Murray is in Salt Lake County. One local hurdle to plan for: Salt Lake County Health Department (SLCoHD) Pre-Demolition Asbestos Inspection. We go over it during the free site visit and build it into the schedule, so it doesn't stall the job halfway through. Debris from Murray jobs is hauled to Salt Lake Valley Landfill, and clean concrete from full removals goes to recycling.

Older pools can contain asbestos in places you wouldn't expect, such as some plaster finishes, deck and coping materials, and asbestos-cement drain or return pipes. Before any concrete is broken, a Utah-certified asbestos inspector checks the pool and deck. If anything turns up, a licensed abatement contractor removes it before demolition starts, and that step is scheduled ahead of time so the job doesn't stall.

Partial vs. full removal

Which removal is right for your Murray yard?

FeaturePartial demolition (fill-in)Full structural demolition
Average cost$8,400 – $11,500$12,500 – $22,000+
Concrete & rebarBroken up and buried in the bottom of the pool100% removed and recycled off-site
Future useLawns, gardens, decorative gravelADUs, garages, home additions, patios
CompactionStandard landscape compaction95% Modified Proctor (ASTM D1557), density tested
Selling your homeBuried fill generally has to be disclosedCompaction report to show buyers
Timeline2 – 3 days3 – 5 days

Cost estimator

What will your pool removal cost?

Set your pool's size and removal method for a ballpark number.

We break up the top of the shell, punch drainage holes in the floor, and backfill over the rubble.

32 ft
15 ft60 ft
16 ft
10 ft30 ft
6 ft
4 ft10 ft

Estimated project cost

$10,016

113.8 yd³ pool volume · typical partial removal: $8,400 – $11,500

Mobilization

8-ton midi excavator + 25.9K GVWR tandem dual trailer

$2,500

Demolition & compaction

Break out the top of the walls, punch floor drainage, compact in lifts

$5,116

Fill dirt

12 × 12-yd loads at $200 (incl. compaction allowance)

$2,400

A rough estimate, not a quote. Access, permits, and soil conditions can change the final price. We confirm it after a free on-site visit.

Access & equipment check

Three questions before your quote

How wide is the access to your backyard?
What kind of pool is it?
What's going in after the pool?

FAQ

Pool removal questions in Murray

What is the difference between a partial fill-in and a full structural demolition?

In a partial demolition, we drain the pool, punch 18–24 inch drainage holes through the floor, break the top 24–36 inches of the bond beam and walls into the bowl, and backfill with compacted fill. It works well for lawn and light landscaping. In a full structural demolition, the entire shell, rebar, tile, liner or fiberglass, and plumbing are broken out and hauled away, and the hole is filled with clean structural fill compacted in 8-inch lifts to 95% Modified Proctor density. Choose full removal if you plan an ADU, garage, addition, or a new pool.

Can I build an ADU, detached garage, or patio over a removed pool in Murray?

Yes, with a full structural demolition and engineered backfill. In Murray, we compact fill in thin lifts to 95% Modified Proctor density (ASTM D1557), and building departments commonly ask for density test results from a testing firm before approving footings. A partial fill-in leaves broken concrete in the ground and is not a sound base for structural footings.

How do you drain the pool water legally in Murray?

De-chlorinate below 0.1 ppm before storm drain discharge; max 30 GPM. Some cities send pool water to the sanitary sewer instead of the storm drain, so we confirm which applies before the pump goes in. We test chlorine levels and pump through sediment filter bags before any water leaves the site.

Who shuts off the gas and electric to the pool equipment?

Most in-ground pools have a gas heater and a dedicated electrical sub-panel. Utilities in Murray are Enbridge Gas Utah (formerly Dominion Energy) gas and Murray City Power electric. Licensed trades cap the gas line and disconnect and lock out the pool circuits before any demolition starts, coordinated with the utility where it's needed.

Does pool removal in Salt Lake County require an asbestos inspection?

Yes. Murray's pre-demolition requirement is: Salt Lake County Health Department (SLCoHD) Pre-Demolition Asbestos Inspection. Older pools can contain asbestos in places you wouldn't expect, such as some plaster finishes, deck and coping materials, and asbestos-cement drain or return pipes. Before any concrete is broken, a Utah-certified asbestos inspector checks the pool and deck. If anything turns up, a licensed abatement contractor removes it before demolition starts, and that step is scheduled ahead of time so the job doesn't stall.

Will removing my pool hurt my property value or cause problems when I sell?

An aging pool with cracked gunite or a torn liner can turn buyers away and complicate financing. The Utah Seller's Property Condition Disclosure asks sellers to disclose known buried debris, fill, and settling, so a partial fill-in generally has to be disclosed when you sell, and a buyer's inspector or lender may flag it. Full removal with a compaction report frees up the yard and gives you documentation instead of a disclosure question.

How do you get heavy equipment into a tight backyard?

Access: Minimum 6-foot side yard gate clearance required for 8-ton midi excavator. Many side-yard gates are 48 to 72 inches wide, so when access is too narrow we plan another route, such as removing a fence panel, during the site visit. We lay ground protection mats over driveways, turf, and irrigation lines to spread the machine's weight and prevent cracked concrete and rutted lawn.

How long does pool removal take?

Most full removals take 3 to 5 days on site. Days 1–2: utility disconnects, draining, and permit clearance. Days 2–3: demolition, steel separation, and haul-off to concrete recycling. Days 4–5: fill import, compaction testing, and finish grading for landscaping or concrete. Partial removals usually finish in 2 to 3 days.

Also serving Salt Lake County